The consultants have released their report summarizing the 230+ responses from the public during the current (Phase IV) of this study. The majority of responses on the infrastructure topic favored an LRT based solution forming a loop crossing the Ottawa River both west and east of the downtown and terminating on the Gatineau side at boul Lorain. On the topic of operations, the top 3 comments were to (a) co-ordinate STO and OC Transpo schedules at transfer points, (b) introduce a common fare system, and finally (c) introduce a common smart card system. A final recommendation from the NCC and their consultants is promised for late 2010/early 2011. For more details on this topic or to see the final report visit our Interprovincial Transit web page |
CCC Latest News >